5.7.1 Add Shift
5.16 Add Shift
Overview: A side panel for adding a production shift: its title, assembly line, dates and start and end times.
Purpose: Record a new production shift on the schedule.
MENU PATH Menu › Production Planning › Schedule Planning
Procedure
1. Click Add Shift at the top-right of the calendar. The Add Shift panel opens.
2. Enter a Title for the shift.
3. Select the Assembly line.
4. Select the Start Date and End Date.
5. Select the Start time and End time.
6. Click Add to save the shift, or Cancel to close without saving.
Figure 5.16 – Add Shift panel